期刊文献+

土石坝坝体溢洪道底板动水压力的计算与修正

Calculation and Correction for Dynamic Water Pressure of Over-flow Earth-rock Dam
下载PDF
导出
摘要 通过对已有溢流混凝土面板堆石坝模型试验成果的分析,发现当泄槽设置多道掺气挑坎时,由于掺气挑坎对水流的扰动影响,使得泄槽底板上的动水压强分布极不规则,作用于泄槽底板上动水压力的模型试验实测值与计算值相差较大,并随底板在泄槽中所处的位置而变化;根据模型试验实测值与计算值的对比,提出了计算底板动水压力时的修正建议。 Through the hydraulic experiments of the over-flow earth-rock dam, the data of experiments were analyzed. The results showed that when spillway has many aeration ridges, the distributing of dynamic water pressure is ahnormity. It was found that the data measured by the hydraulic experiments made a great difference with the data counted, and the different position with the different change. At last, from the contrast of two projects,the advice on fixing parameter had been given.
作者 杨京 唐新军
出处 《新疆农业大学学报》 CAS 2007年第4期106-109,共4页 Journal of Xinjiang Agricultural University
基金 新疆高等学校科研计划重点项目(XJEDU2004I14) 新疆水利水电工程重点学科项目(xjzdxk-2002-10-05)
关键词 土石坝 溢洪道 掺气挑坎 动水压力 修正建议 earth-rock dam spillway aeration ridge dynamic water pressure amendatory advice
  • 相关文献

参考文献3

  • 1水利部天津水利水电勘测设计研究院.溢洪道设计规范(SL253—2000).北京:中国水利电力出版社,2006.
  • 2胡去劣,俞波.新疆保尔德水库面板坝坝面溢流试验研究报告[R].南京:南京水利科学研究院,1994-05.
  • 3吴一红.保尔德混凝土面板堆石坝坝面溢流方案试验研究报告[R].北京:中国水利水电科学研究院,1993-11.

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部