摘要
介绍了华晋焦煤有限责任公司沙曲矿白家坡风井的工程概况和基岩段施工方案与施工设备,对施工方法和快速施工措施进行了阐述。
This paper introduces the general situation of the construction of Baijiapo airshaft in Shaqu Coal Mine, Huajin Coking Coal Limited Company, expounds its construction scheme and equipment in the bedrock section, and illustrates the construction methods and the rapid construction measures.
出处
《科技情报开发与经济》
2007年第11期281-282,共2页
Sci-Tech Information Development & Economy
关键词
立井井筒
基岩段
综合机械化
连续快速施工
vertical pit shaft
bedrock section
comprehensive mechanization
continuous and rapid construction.