期刊文献+

BOT项目风险模糊综合评价模型及其应用 被引量:6

The Fuzzy Comprehensive Assessment Model and Application of BOT Projects Risk
下载PDF
导出
摘要 针对BOT项目风险体系复杂这一特点,采用多层模糊分析与层次分析法相结合,提出了一种综合考察BOT项目中各风险因素的多级模糊综合评价方法。最后以S省某道路建设BOT项目为例,介绍了该方法的应用。 As far as the complexity of BOT project risk system, multi-hierarchy mistiness synthesis and hierarchy analysis method are combined in the article and the author puts forward one kind of multi-hierarchy synthesis appraise model and takes road construction of S province as an example and introduces the application.
出处 《技术经济》 2007年第12期78-82,共5页 Journal of Technology Economics
关键词 BOT项目风险评价 多层次模糊分析 模型应用 BOT project risk appraise multi-hierarchy synthesis application of model
  • 相关文献

参考文献4

二级参考文献12

  • 1许树柏.实用决策方法—层次分析法原理[M].天津:天津大学出版社,1998..
  • 2Seitz,Helmut & Licht,G , The Impact of Public Infrastructure Capital on Regional Manufacturing Production Cost. Regional Studies, Vol. 29,1995,231-240.
  • 3Nagy, Pancras J , Country Risk:How to Assess,Quantify and Monitor It. Euro money Publication. London. 1979.
  • 4Shou Oing Wang and Tiong. R L K. (1998). Evaluation and Competitive Tendering of BOT Power Plant Proiect in China. Journal of construction engineering and management. Vol. 124,No. 4,July/August.
  • 5Xueqing Zhang. (2004). Concessionaire Selection: Methods and Criteria. Journal of construction engineering and management ,Vol. 130,No. 2 ,April 1,235- 244.
  • 6邱菀华.现代项目管理导论[M].北京:机械工业出版社,2003..
  • 7诸克军,张新兰,肖荔瑾.Fuzzy AHP方法及应用[J].系统工程理论与实践,1997,17(12):64-69. 被引量:107
  • 8张水波,孔德泉,何伯森.BOT项目风险管理的担保手段[J].中国软科学,2000(2):73-76. 被引量:21
  • 9周维虎,李谦,邱耀先,丁叔丹,费业泰.科研院所技术创新能力的模糊综合评判[J].科研管理,2000,21(5):84-89. 被引量:13
  • 10周平,朱松岭,姜寿山.基于模糊层次分析法的航空项目风险管理研究[J].计算机集成制造系统-CIMS,2003,9(12):1062-1066. 被引量:24

共引文献37

同被引文献34

引证文献6

二级引证文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部