运用系统仿真对大型混凝土拱坝施工进度作风险分析,通过不同施工缆机数量和布置平台构筑的多个施工方案比较,从中选出了最佳施工方案。
The systematic analog method is used to analyze the risk of construction progress of large concrete arch dam; several ahernative construction schemes constituted of different numbers of cable cranes and their laying platforms are comparod; and the best one is chosen out from them.
出处
《湖北水力发电》
2007年第6期43-46,共4页
Hubei Water Power
关键词
混凝土拱坝
施工进度
风险分析
concrete arch dam
construction progress
risk analysis