摘要
对风积沙最大干密度的确定及施工机械的要求与选择进行了介绍,阐述了沙路基填方的施工要求,论述了风积沙路基的压实工艺,并对风积沙路基石灰土封层的施工进行了介绍,以供类似工程参考。
It introduces the maximal dry density determination of the eolian sand and the requests and selection of construction machines, represents the construction requests of the desert road formation, discusses the compacted technology of the eolian sand formation, and introduces the limestone seal construction of the eolian sand formation, which will supply reference to similar projects.
出处
《山西建筑》
2007年第35期300-301,共2页
Shanxi Architecture
关键词
沙漠公路
公路路基
施工工艺
干密度
desert road, road formation, construction technology, dry density