介绍武钢工业港1#、2#码头改造工程钢管桩穿透9m厚抛石层的设计施工技术对策及成功经验,可为长江中上游类似厚抛石护岸边坡地区码头设计与施工提供借鉴。
This paper introduces the design and construction countermeasures and successful experience of steel pipe pile penetrating 9 m thick riprap layer in Wharf No. 1 & No.2 reforming project of Wuhan Iron & Steel Corporation industry port, which may serve as a reference for wharf design and construction in similar thick riprap layer area on the middle and upper reaches of the Yangtze River.