摘要
通过世界妇女大会会议中心的工程实践讨论该工程27m×42m无粘结预应力大跨度井字梁的设计思想和无粘结预应力施工,并通过测试进一步分析验证。
\ Based upon the engineening construction of the Hall of Meeting of World Woman,the method of desjgn and construction of the long span prestressed concrete caission beam without bond is discuseed, and is verfied by the results of the tests
出处
《工业建筑》
CSCD
北大核心
1997年第8期14-17,共4页
Industrial Construction