摘要
阳明山水电站拦河坝采用C15细石混凝土砌石双曲拱坝,坝顶表孔泄洪,挑流消能。整个坝体不分缝,施工进度快,降低工程造价。本文对此拱坝的设计进行了介绍。
Yangmingsha Hydropower station dam is a C15 small size aggregate concrete stone masonry double curvature arch dam with crest spillway and flip buckets for energy dissipation. The whole dam is not divided into blocks by joints. The construction proceeded fast and the cost was lowered. This pape give a presentation of the arch dam design.
出处
《水电站设计》
2007年第4期4-7,共4页
Design of Hydroelectric Power Station
关键词
砌石拱坝
双曲拱坝
泄洪
无缝设计
最优设计
阳明山水电站
masonry arch dam
double curvature arch dam
flood discharging
jontless design
optimum design
Yangmingsha Hydropower station