摘要 阐述了结合生产科研项目建立沉降实验实习基地的目的、方法及实施步骤和功能。该基地的建成将获得良好的实验实习效果,提高了实践教学质量,并在生产科研与教学相结合方面作了有效的尝试。 Combined with production and scientific project the purpose, method, step and function of establishing settlement observation experiment practice basement were elaborated. The construction of the basement will acquire great experiment and practice effect, improve quality of practice teaching and make an effective try in the combination of production and scientific research with teaching,
作者 宁殿民
出处 《鞍山科技大学学报》 CAS 2007年第5期553-555,共3页 Journal of Anshan University of Science and Technology
关键词 沉降测量 实习基地 工作水准点 沉降观测点 settlement observation practice basement job BM settlement observation point
  • 相关文献

参考文献7

二级参考文献4

  • 1.GB500-93.工程测量规范[S].,1993..
  • 2.CJJ8-85.城市测量规范[S].,..
  • 3.GBJ7-79.建筑地基基础设计规范[S].,..
  • 4张克勤.城市测量[M].济南:山东省地图出版社,1994.228-234.

共引文献27

同被引文献9

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部