期刊文献+

有害物品运输中“多点”—“多点”的风险公平性研究 被引量:5

Risk Equity Analysis for Hazardous Materials Transportation with Multi-origins and Multi-destinations
下载PDF
导出
摘要 在有害物品运输过程中,可能在多个起点和多个终点之间需要完成运输任务,因此网络中的某些路段可能被多次选择,从而导致这些路段上的人口与其他人口相比承担了较多的风险。为了实现有害物品运输过程中的风险公平性,本文给出了有害物品运输过程中区域风险差异和个体风险差异的定义,并建立了区域风险差异和个体风险差异的模型,然后,构建了一个考虑了人口风险、区域风险差异和个体风险差异的实现有害物品运输中"多点"—"多点"的风险公平性的模型,并给出了进行路径选择的启发式算法。 Because the risk is not equably distributed in the whole route, the people in some route segments may have greater risk than the others. This makes the inequity of risk in the hazardous materials transportation. The paper defined the concept of area risk variance and individual risk variance in the hazardous materials transportation and gave the models to compute them. Furthermore, there always have multiorigin and multi-destination in the transportation network. In order to make the equity of risk in the transportation, the paper developed a model including the population risk, area risk variance and individual risk variance. Then, we developed the heuristic algorithm for the problem. At last, a case was studied.
出处 《管理工程学报》 CSSCI 2007年第4期1-6,共6页 Journal of Industrial Engineering and Engineering Management
基金 国家自然科学基金资助项目(70471039) 教育部新世纪优秀人才支持计划项目(NCET-04-0886)
关键词 有害物品运输 风险公平性 “多点”-“多点” hazardous materials transportation risk equity multi-origins-multi-destination
  • 相关文献

参考文献10

  • 1List, Mirchandani, Turnquist, Zografos. Modeling and analysis for hazardous materials transportation: risk analysis, routing/scheduling and facility location[J]. Transportation Science, 1991, 25(2): 100-114.
  • 2List G., Abkowitz M.. Estimates of current hazardous material flow patterns[J]. Trans. Quart., 1986, 40:483 - 502.
  • 3Schmidl J. W., Price D. L.. The flow of hazardous materials on virginia hlghways[J]. J. Safety Res., 1979, 11 : 109 - 114.
  • 4毕军,王华东.有害废物运输环境风险研究[J].中国环境科学,1995,15(4):241-246. 被引量:29
  • 5Iakovou E., et al. A maritime global route planning model for hazardous materials transportation[J]. Transportation Science, 1999, 33(1): 34-48.
  • 6Fabiano B., Curro F., Palazzi E., et al. A framework for risk assessment and decision-making strategies in dangerous good transportation[ J]. Journal of Hazardous Materials, 2002, 93 : 1 - 15.
  • 7Martinez-Alegria, Ordonez C., Taboada J.. A conceptual model for analyzing the risks involved in the transportation of hazardous goods: implementation in a geographic information system [ J ]. Human and Ecological Risk Assessment, 2003, 9(3): 857 - 873.
  • 8Gopalan R., Kolluri K. S., Batta R., Karwan M. H.. Modeling equity of risk in the transportation of hazardous materials [ J ]. Operations Research, 1990, 38, (6) : 961 - 973.
  • 9Lindner-Dutton L., Batta R., Karwan M. H.. Equitable sequencing of a given set of hazardous materials shipments [ J]. Transportation Science, 1991, 25(2): 124 - 137.
  • 10Garey M, R., Johnson D, S.. Computers and intractability[ M]. W. H. Freeman, San Francisco, CA, 1979, 285 - 380.

二级参考文献2

  • 1匿名著者,中国统计年鉴,1991年
  • 2陈--,决策分析,1989年

共引文献28

同被引文献21

引证文献5

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部