摘要
通过对水土保持工程施工阶段设计变更原因的分析,指出水土保持生态工程施工阶段变更的必要性和建设、监理单位对变更管理的重要性。通过对变更设计的程序和原则进行的分析,阐述了变更设计涉及的几个主要问题。
On the basis of analyzing reasons of design change in soil and water conservation project construction, the necessity of changes in the construction stage and importance of change management by supervisors are presented. Issues related to change of design are discussed in terms of procedure and principle of design change.
出处
《中国水利》
2007年第22期43-44,共2页
China Water Resources
关键词
变更设计
水土保持
淤地坝
change of design
soil and water conservation
silt retention dams