摘要
研究目的:我国目前岩溶隧道涌水量有许多计算方法。虽然方法众多,但对隧道设计要求的正常涌水量及最大涌水量还不能完全满足,仍存在较大误差,有必要深入研究,寻求新的途径。研究方法:根据浅埋岩溶长隧道-南岭隧道涌水量及地表泉的长期观测资料,利用反演推导得出新的方法。研究结果:通过研究得出大泉流量预测法、隧道涌水曲线反演分析法(新均衡法),同时根据长期观测资料得出隧道影响半径(集水范围)、枯水期涌水量、枯水期单位长度富水量、降雨入渗系数等重要水文地质参数及不同季节隧道涌水量比值。研究结论:建议在水文地质参数和涌水量取值方面,转变设计、施工观念;岩溶隧道的修建应贯彻科学发展观进行全面评估。
Research purposes: At present, there are many methods in China of computing the water - bursting volume in karst tunnel. Although there are many methods, but they can not completely meet the tunnel design requirements for computing normal water -bursting volume and max. water -bursting volume with big gaps, so it is necessary to do the researches for the purposes of seeking new way. Research methods:A new method is obtained by surface spring water -bursting volumes in Nanling adopting inversion derivation with long - term observed data about and Tunnel, a long shallow buried karst tunnel. Research results :The prediction method of big spring flow and curve inversion analysis method (new balance method) of water- bursting in tunnel are obtained through doing researches, and at the same time, many important hydrological and geological parameters and the ratios of water - bursting volumes in tunnel in different seasons are obtained with long -term observed data, including water -collection area, water - bursting volume in dry season, water- enriching volume for one unit length in dry season and the factor of rain penetrating into tunnel. Research conclusions: The design and construction concepts on hydrological and geological parameters and sampling water -bursting volume should be changed, and the construction of karst tunnel should be evaluated with scientific development outlook.
出处
《铁道工程学报》
EI
北大核心
2007年第11期48-55,64,共9页
Journal of Railway Engineering Society
关键词
岩溶隧道
边界条件
长期观测
涌水量
参数
预测
展望
karst tunnel
boundary condition
long - term observation
water - bursting volume
parameters
prediction
prospects