摘要 北京银泰中心工程地面建筑由一座酒店、两座办公楼和三座裙房组成,地下为长218.2m,宽99.2m的整体4层地下室,所有地上建筑都坐落在整体地下室的顶部。工程基础底面受力极不均匀,各栋建筑对沉降的不均匀性十分敏感,且基础工程量巨大,对工程总投资和工程进度都有较大影响,因此,工程在基础选型、持力层和桩径的选取、新技术的采用以及施工监测方面都做了较充分的方案论证和分析计算,所做工作为整个工程的顺利竣工打下了坚实的基础。 Beijing Yintai Center project is composed of a restaurant, two office buildings and three assistant buildings. All the buildings are based on four floors basement structure which is 218.2m long and 99.2m wide. The loads on base are changed greatly and each building is sensitive to asymmetric settlements. The structure design gets sufficient project argumentation and computing in selecting type of base, confirming the right bearing load earth layer and diameters of piles, using new technology and inspecting construction.
出处 《建筑结构》 CSCD 北大核心 2007年第11期16-19,共4页 Building Structure
关键词 差异沉降 静载试验 沉降后浇带 桩端桩侧后压浆技术 differential settlement static load test settlement strip of post-cast concrete post-pressure grouting technology
  • 相关文献

参考文献7

  • 1张相勇,娄宇,常为华.北京银泰中心桩筏基础设计[J].建筑结构,2007,37(7):97-101. 被引量:5
  • 2北京银泰中心后压浆钻孔灌注试验桩检验报告[R].冶金工业工程质量监督总站检测中心,2003.
  • 3北京银泰中心桩基工程桩检测报告[R].冶金工业工程质量监督总站检测中心,2004.
  • 4.建筑桩基技术规范(JGJ94-94)[S].北京:中国建筑工业出版社,1995..
  • 5DBJ01-501-92,北京地区建筑地基基础勘察设计规范[S].北京市勘察设计管理处,1992.
  • 6北京地区建筑大直径灌注桩技术规程(DBJ01-502-99)[S].北京市建设委员会,1999.
  • 7建筑地基基础设计规范(GB50007-2002)[S].北京:中国建筑工业出版社,2002.

二级参考文献3

  • 1(GB50007--2002).建筑地基基础设计规范[S].[S].,..
  • 2(JGJ94-94).建筑桩基技术规范[S].[S].,..
  • 3北京市勘察设计研究院.北京银泰中心岩土工程阶段勘察报告(2002技208-3)[R].2003.