摘要
大型基坑工程都具有复杂、工程难度大、成本高等特点,对其进行优化设计尤为重要。以上海南站南广场大型基坑为例,对其设计进行优化。优化内容包括利用场地条件采取可靠措施减少围护墙荷载、改变支撑体系、减少支撑道数、调整预留土台及加固体宽度及高度并设置与改变支撑体系相适应的挖土施工工艺等。实施结果表明该优化方案能节约工程成本、缩短工期。
A large foundation pit has the feature of complexity, difficulty, and expressivity. So it is important to optimize the design. The design of foundation pit of South Square of South Railway Station in Shanghai is optimized. The aspects of optimization include support system, construction procedure, structure and consolidation, and so on. The results show that the optimized schedule can decrease the cost and time, so it provides a good reference for similar project.
出处
《建筑结构》
CSCD
北大核心
2007年第11期72-74,55,共4页
Building Structure
关键词
基坑围护
设计优化
地下连续墙
支撑体系
中心岛工法
enclosure of foundation pit
design optimization
diaphragm wall
support system
the method of center island