摘要
以建设投资、年运行费用估算为基础,对该公司新建200t/h酸性水汽提装置进行项目多方案论证,选择最优方案。
Based on construction investment and estimated annum operational fee, to analyze the case study of newly-established 200 t/h acid-water steam stripping plant. The optimum case is selected by this way.
出处
《化学工业》
CAS
2007年第11期42-44,共3页
Chemical Industry
关键词
工业废水
酸性废水
污水处理技术
汽提
脱硫
经济评比
方案评价
industrial waste water
acid waste water
waste water treatment
technique
steam stripping
desulfuration
economic evaluation
scheme evaluation