期刊文献+

隧道地震响应数值模拟研究 被引量:25

NUMERICAL SIMULATION OF SEISMIC RESPONSE AT THE ENTRANCE OF THE UNSYMMETRICAL LOADING TUNNEL
下载PDF
导出
摘要 在进行隧道地震响应的数值模拟研究时,横向计算范围和人工边界等对计算结果有很大的影响。本文以黄草坪隧道为研究对象,应用有限差分程序FLAC3D对其进行地震响应的数值模拟研究,将横向计算范围分别取为隧道洞径的5倍、6倍、7倍、8倍、9倍和10倍,并分别采用FLAC3D中的截断边界、自由场地边界和粘性边界进行计算。研究结果表明,当地震波为P波时,横向计算范围取为洞径的7至8倍,人工边界采用自由场地边界或粘性边界是比较合理的。 In the mathematic modeling of the seismic resPonse of a tunnel, the lateral calculation range and artificial boundary have great influence on the result of calculation. With the Huangcaoping tunnel as the study objective, its seismic response is simulated using the finite difference procedure FLAC3D. The 5, 6, 7, 8, 9 and 10 times the diameter of the entrance of the tunnel are taken as the lateral calculation range respectively, and the cutting boundary, free-field boundary and viscous boundary in FLAC3D are used for the calculation. The results of the study indicate that it is relatively reasonable to take 7 - 8 times the diameter of the entrance of the tunnel as the lateral calculaiton range and the freefield boundary or viscous boundary as the artificial boundary when the seismic waves are P-waves.
出处 《地质力学学报》 CSCD 2007年第3期255-260,共6页 Journal of Geomechanics
基金 西部交通建设科技项目(编号:200431800029)
关键词 隧道 地震响应 FLAC^3D 横向计算范围 人工边界 tunnel seismic response FLAC^3D lateral calculation range artificial boundary
  • 相关文献

参考文献5

二级参考文献12

  • 1刘春玲,祁生文,童立强,赵法锁.利用FLAC^(3D)分析某边坡地震稳定性[J].岩石力学与工程学报,2004,23(16):2730-2733. 被引量:196
  • 2Lysmer J, Kulemeyer R L. Finite Dynamic Model for Infinite Media [J]. Journal of Engineering Mechanics Division ASCE, 1969,95: 759-877.
  • 3Whitham G B. Linear and Nonlinear Waves[M]. New York,Wiley. 1974.
  • 4Kiyomiya O. Earthquake Resistant Design Features of Immersed Tunnels in Japan [ J ]. Tunnelling and Underground Space Technology, 1995, 10 (4): 463-475.
  • 5董新平.[D].成都:西南交通大学,2000.
  • 6中国地震局地壳应力研究所.京沪高速铁路南京上元门越江工程桥隧场地地震安全性评价报告[R].北京:中国地震局地壳应力研究所,1998..
  • 7Itasea Consulting Group Inc.FLAC3D(Fast Lagrange Analysis of Continua in 3 Dimensions)Users Manual[M].USA:Itasea Consulting Group Inc,2005.
  • 8G318线海子山至竹巴笼段公路黄草坪新线隧道、桥梁工程场地地震安全性评价报告[R].成都:四川省地震局工程地震研究所,2002.
  • 9刘晶波,吕彦东.结构-地基动力相互作用问题分析的一种直接方法[J].土木工程学报,1998,31(3):55-64. 被引量:441
  • 10王明年,关宝树.地下结构是减震结构[J].工程力学,1999,1(a01):802-807. 被引量:9

共引文献44

同被引文献216

引证文献25

二级引证文献70

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部