摘要
本文主要阐述了船用柴油主发电机弹性支撑底座安装的特点,从而针对一般施工工艺中的问题进行总结并改进与完善,达到提高作业效率,缩短生产周期的目的。
This paper mainly introduces the fixing of marine M/G flexible foundation and summarizes the issues which occur in the fixing in order to improve the technology and increase the work efficiency.
出处
《广东造船》
2007年第4期54-56,共3页
Guangdong shipbuilding
关键词
柴油发电机
弹性支撑
安装工艺
改进
M/G (main generator), Flexible foundation, Technology improving