摘要
南水北调中线全线自流,各渠段水头分配很严格,穿黄隧洞作为路线上的关键工程,正确估算其水头损失非常重要。文章利用1:29.17的正态模型对穿黄隧洞的沿程水头损失系数λ与Re的关系进行了研究;对穿黄隧洞的总水头损失进行了测量,并与计算结果进行比较。所获得的设计与校核流量下的总水头损失值,可供工程设计、校核参考。
In the middle Route Project (MRP) for South-to-North Water Diversion the water will flow automatically, and water head is very small for every channel. So it is very important for tunnel crossing Yellow River,a critical path in MRP, to estimate its head loss correctly.Based on the undistorted model with scale I ~ 29. 17, the paper studied the relation of λ and Re in the tunnel crossing Yellow River, and conducted the total head loss of the tunnel. Furthermore, it compared the calculation with test result. The conclusion can he referred by the design and verification of MRP.
出处
《南水北调与水利科技》
CAS
CSCD
2007年第6期5-7,共3页
South-to-North Water Transfers and Water Science & Technology
基金
国家自然科学基金资助项目"高水头
大流量泄洪洞和长距离引水隧洞水力学关键技术问题研究"(50539070)
关键词
南水北调
穿黄隧洞
水头损失
模型试验
South-to-North Water Diversion
Tunnels Crossing Yellow River
Head loss
Model test