摘要 以丹江口大坝溢流坝边墩为研究对象,通过三维有限元接触问题非线性计算,分析在溢流面加高过程中,不同的溢流面与老闸墩的结合状态下(脱开与不脱开),各阶段包括加高完成后、正常蓄水位、设计洪水位、校核洪水位时闸墩的受力状况、锚筋应力和结合面张开度。计算结果表明:锚筋的无黏接长度以100cm为宜;将边墩162m高程以上加高部分与旁边重力坝段加高部分连成整体,或在结合面张开最大的部位沿竖直向增加一排约束,均可有效减小混凝土竖直向应力,且对抑制结合面张开亦有较大作用。 By three-dimensional finite element contact question non linear simulation computation, this article, taking the overflow dam side pillar of DanJiangkou dam as the study object, analyzes the floodgate pillar stress state, the anchor rod stress and the seam open at different bound condition (joint or disjoint) between the overflow surface and the floodgate pillar in various heightening stages, which involve completion of heightening, the normal store water level, design flood level and check flood level. The results indicated that, the non-cementation length of anchor bar takes 100 cm as proper; connecting heightened part above the 162 m of side pillar with that of adjacent gravity dam section as a whole, or setting a row of restraint along vertical direction at the largest open spot in the seam surface, might reduce the concrete vertical stress effectively, and suppress the seam to open greatly.
出处 《南水北调与水利科技》 CAS CSCD 2007年第6期48-50,65,共4页 South-to-North Water Transfers and Water Science & Technology
基金 "十一五"国家科技支撑计划重大项目"南水北调工程若干关键技术研究与应用"(2006BAB04A01)
关键词 丹江口大坝 加高过程 溢流坝闸墩 the Danjiangkou Dam heightening process floodgate pillar of overflow dam
  • 相关文献

参考文献3

  • 1[1]程子兵,李利.南水北调中线水源工程丹江口大坝加高枢纽工程表孔体型优化断面模型试验报告[R].武汉:长江科学院,2002.
  • 2[2]徐跃之,林绍忠.三峡船闸第三闸首温度应力及缝面接触问题三维非线性仿真计算[R].武汉:长江科学院,1997.
  • 3[3]徐跃之,陈琴.三峡永久船闸(全衬式)衬砌墙锚杆和岩体相互作用仿真计算[R].武汉:长江科学院,1997.