9LAMBE.T.W. Methods of estimating settlement [J]. Proc. ASCE. JSMFD. Vol.90(40):1964:915-926.
10S.B. TAN. An empirical method for estimating secondary and total settlement. Pro. of the eighth inter [J].conference on soil mechanics and foundation Eng. Vol.3.1973.