简述了江西泰和南车水库枢纽电站导流洞进口堵水闸门工程中采用钢筋混凝土板梁结构的设计计算,并与钢闸门方案进行了技术经济比较,分析了受力特点及其造价。
It is briefly stated that the design of the plate girder structure of reinforced concrete was made for the blocking-water gate project at the entrance of the diversion tunnel of the pivotal power station at Jiangxi Taihe Nanche Reservoir,and technically and economically compared with the plan of steel gate structure,and its characteristics of being forced,cost of building and applied effects was analyzed.
出处
《南昌大学学报(工科版)》
CAS
1997年第1期42-47,共6页
Journal of Nanchang University(Engineering & Technology)
关键词
钢筋混凝土
板梁
闸门
应用
钢筋混凝土闸门
the plate girder of reinforced concrete,water conservancy,works gate, application