期刊文献+

高速铁路自然过分相方案 被引量:7

Scheme for Naturally Passing Neutral Sections of High Speed Railways
下载PDF
导出
摘要 在深入研究机车带负荷过分相产生电弧机理的基础上,提出了自然过分相技术方案.该方案的基本原理是在车载变压器高压侧和牵引供电臂末端分别并联一个电容,当机车过分相时,牵引网和车载电气传动系统实现等电位分离,避免了机车过分相时产生电弧.自然过分相方案和现在使用的3种方案相比,具有过分相断电时间短,结构简单,投资少,运行维护量小等优点.自然过分相方案还能大幅度降低机车运行时离线电弧的强度. A scheme of naturally passing neutral sections was proposed based on the mechanism of arcing when a train passes the neutral section. In the scheme, a shunt capacitor is connected to both the pantograph and the high voltage winding of the transformer on board. When the locomotive passes the neutral section, there is no arcing because the electric traction system on board has the same potential as that of the catenary. Compared with 3 existing schemes for passing neutral sections, the proposed one is shorter in power-off time, simpler in configuration, and less in investment and maintenance. It also reduces arc intensity significantly when the pantograph bounces on the contact wire.
出处 《西南交通大学学报》 EI CSCD 北大核心 2007年第6期680-684,690,共6页 Journal of Southwest Jiaotong University
关键词 过分相 电弧 受电弓 接触网 方案 passing neutral section arc pantograph catenary scheme
  • 相关文献

参考文献9

二级参考文献18

  • 1林磊.自动分相装置试验的浅析[J].电气化铁道,1998(3):37-38. 被引量:5
  • 2严云升.SS8型电力机车的微机控制[J].机车电传动,1994(6):1-5. 被引量:2
  • 3王补宣.工程传热传质学(上册)[M].北京:科学出版社,1998..
  • 4戴利民.滑板材料受流摩擦磨损性能的研究[M].铁道部科学研究院,2001.70-88.
  • 5株洲电力机车研究所.TAX2型机车安全信息综合监测装置安装使用维护说明书[M].株洲:株洲电力机车研究所,2001..
  • 6H.霍夫特 H.G.施奈德(德).电接触[M].北京:机械工业出版社,1988..
  • 7戴利民.滑板材料受流磨擦磨损性能的研究.铁道部科学研究院博士研究生论文[M].,2001..
  • 8严云升,机车电传动,1994年,6期
  • 9林磊,电气化铁道,1998年,3期
  • 10严云升.电力机车自动过分相方案的探讨[J].机车电传动,1999(6):1-3. 被引量:43

共引文献149

同被引文献55

引证文献7

二级引证文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部