750 kV变压器现场局部放电试验有关问题分析 被引量:15

Analysis of On-site Partial-discharge Test on 750 kV Transformers
下载PDF
导出
摘要 笔者总结了示范工程中变压器现场局放交接试验的程序、标准、过程,分析了出现的问题,提出如下建议:①提高750 kV变压器的工频试验电压;②不宜反复进行局放试验;③现场试验局放超标时应务实处理;④重新定义局部放电起始电压和熄灭电压;⑤必要时采用可靠的在线监测设备。这些建议不限于750 kV变压器,亦可为1 000 kV变压器的现场交接试验参考。 This paper analyzes the problems concerning pro- cedure, standards, and process in the on-site acceptance partial-discharge(PD) test on the 750 kV transformers. Some suggestions are therefore offered as follows:(1)increase the power frequency withstand test voltage for 750 kV transformers; (2)avoid to perform PD test repeatedly;(3)take practical measures if PD quantity exceeds the criterion stated in standard; (4)redefine the PD inception voltage and extinction voltage; (5)use reliable on-line monitoring apparatus when necessary. These suggestions can also serve as a reference for the same test on 1 000 kV transformer.
出处 《高压电器》 EI CAS CSCD 北大核心 2007年第6期434-437,共4页 High Voltage Apparatus
关键词 变压器 局部放电 试验 transformer partial discharge test
  • 相关文献

参考文献18

  • 1兰州东变变压器出厂报告[R].西安:西电变压器有限责任公司.2005.
  • 2GB1094.3-2003.电力变压器第3部分:绝缘水平、绝缘试验和外绝缘空气间隙[S].[S].,..
  • 3GB1094.3-1985,电力变压器第3部分:绝缘水平和绝缘试验[S].
  • 4国家电网公司.750kV超高压电气设备交接试验标准(讨论稿)[S].
  • 5GB50150-1991.电气装置安装工程电气设备交接试验标准[S].[S].,..
  • 6Q/GDW 103-2003,750kV主变压器技术规范[S].
  • 7GB 7354-2003,局部放电测量[S].
  • 8DL417-1991,电力设备局部放电现场测量导则[S].
  • 9GB/T16927.2-1997,高电压试验技术第2部分:测量系统[S].
  • 10周力行,何蕾,李卫国.变压器局部放电超声信号特性及放电源定位[J].高电压技术,2003,29(5):11-13. 被引量:50

二级参考文献64

共引文献555

同被引文献192

引证文献15

二级引证文献83

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部