期刊文献+

上海崇明越江通道工程环境地质问题及其防治 被引量:4

Environmental Geological Problems and the Prevention for Shanghai Chongming Thoroughfare Engineering Across the Changjiang River
下载PDF
导出
摘要 上海崇明越江通道工程是长江河口地区重要的国家基础性建设项目,所在区域不良地质条件易给工程施工带来不利影响。文章阐述软土变形、水土突涌、水下砂体运移、浅层天然气、岸带冲淤、砂土液化、地面沉降等环境地质问题及其潜在的工程危害,提出相应的防治对策与技术措施。 Shanghai Chongming thoroughfare engineering is a national important basic construction project in estuarine area of the Changjiang River. The unfavorable geological condition around exerts harmful effects on construction. The environmental geological problems such as soft soil deformation, water and soil piping, sand movement underwater, shallow natural gas' danger, beach erosion and deposition, sand liquefaction and land subsidence, etc., together with their harmful effects on engineering are expatiated, and relevant preventive measures are put forward.
作者 龚士良 李采
出处 《水运工程》 北大核心 2007年第6期1-5,共5页 Port & Waterway Engineering
基金 国土资源部首批百名优秀青年科技人才计划(200219)
关键词 崇明越江通道 长江河口 环境地质问题 灾害防治 Chongming thoroughfare engineering estuary of the Changjiang River environmental geological problems prevention of calamity
  • 相关文献

参考文献5

二级参考文献21

共引文献20

同被引文献30

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部