期刊文献+

株洲航电枢纽施工导流及水流控制 被引量:7

Construction Diversion and Current Control of Zhuzhou Navigation & Hydropower Complex
下载PDF
导出
摘要 分析了株洲航电枢纽施工导流的特点和施工导流方案,根据模型试验成果和坝址自然条件,拟定了合理的围堰断面形式,对围堰进占与截流进行了分析计算,确保了围堰顺利实施,以及工期和投资目标的实现。同时,根据一、二期施工导流的通航水流条件,提出了坝址河段江心洲洲头、左、右汊护坡的防护方案,实现了枢纽安全度汛。株洲航电枢纽的施工导流和水流控制,为工程顺利完工提供了有效的保障。 This paper analyzes the characteristics and scheme of construction diversion of Zhuzhou Navigation & Hydropower Complex. According to the model test result and natural condition of the dam site, a reasonable section shape of cofferdam was proposed, analysis and calculation were carried out to the approach and closure of the cofferdam, which ensured the successful construction of the cofferdam and realized the construction progress and investment control. Besides, based on the current condition of the construction diversion Phases I & II, a scheme of slope protection for the head of island in the river at the dam section and both left and right branches was put forward, which ensured safe operation of the complex during flood season. The construction diversion and current control of Zhuzhou Navigation & Hydropower Complex guaranteed the successful completion of the Project.
作者 李军
出处 《水运工程》 北大核心 2007年第6期56-61,共6页 Port & Waterway Engineering
关键词 株洲航电枢纽 施工导流 水流控制 Zhuzhou Navigation & Hydropower Complex construction diversion current control
  • 相关文献

参考文献4

  • 1SDJ338-89.水利水电工程施工组织设计规范[S].[S].,..
  • 2魏璇.水利水电工程施工组织设计指南[M].北京:中国水利水电出版社,1998.
  • 3谢丽芳.株洲航电枢纽施工导流模型试验研究[R].长沙:长沙理工大学,2001.
  • 4湖南省航海学会.株洲航电枢纽二期围堰合理断航期技术研究报告[R].长沙:湖南省航海学会,2004.

共引文献16

同被引文献31

引证文献7

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部