摘要
介绍了我国与国外大容量压水堆核电机组参与电网调峰的现状,分析了它们参与中间负荷调峰的必要性和可行性,在此基础上深入探讨机组适应日调峰运行需具备的技术条件,特别是对电站核安全、可靠性及经济性的影响,提出了机组适应调峰运行的演进方向。
This paper introduces the actuality of large-scale pressurized water reactors (PWRs) participating in sufficing peak-load of grid, analyses indispensable and feasibility related, probes into necessary technique that units should possessed, influence on nuclear safety, power economic and reliability. Incidentally bring forward the direction of evolution to adapt daily load-following.
出处
《山东电力技术》
2007年第6期35-40,共6页
Shandong Electric Power
关键词
压水堆
核电机组
调峰
影响
PWR
nuclear power unit
suffice peak-load
influence