以规划中的世界第1高塔——舟山大跨越输电塔为背景,对采用钢管混凝土复合构件时的节点进行试验研究,通过有限元计算与试验结果的比较,表明该结构具有优良的承载能力。
On the basis of the planned world highest tower, Zhoushan transmission tower, experimental studies on nodes using composite steel tube and concrete components are carried out, and the comparison of finite element calculation and test data indicates that the structure has excellent load carrying capability.
出处
《电力建设》
2007年第12期39-42,共4页
Electric Power Construction
关键词
大跨越输电塔
钢管混凝土复合构件
节点
有限元分析
large span transmission tower
composite steel tube and concrete component
node