期刊文献+

长三角滨海工业区竖向规划方法研究 被引量:7

Study of Vertical Planning Method for Seashore Industrial Area in Changjiang Delta
下载PDF
导出
摘要 该文针对长三角滨海区域地势平坦低洼、河网密布、防洪排涝标准偏低的现状,在市政详细规划阶段对新建工业区竖向规划方法进行研究,分别考虑了雨水排除高程要求、蓝线和绿线高程要求以及道路、桥梁、场地高程要求。市政详细规划阶段的竖向规划是在控制性详细规划基础上对用地高程做更细致的控制,其对于后续设计工作和项目的分期建设、合理控制投资均具有重要的意义。 According to the present situation of the flat low-lying topography, dense river network and lower flood control drainage standards in the seashore area of Changjiang Delta, the article studies the vertical planning method for the newly built industrial area in the stage of detail municipal planning, and separately considers the rainwater removal elevation requirement, blue line and green line elevation requirements, and the road, bridge and field elevation requirements. The vertical planning in the stage of detail municipal planning is to carry out the more detail control of the land elevation on the basis of controlling detail planning. It has the important significance for the following design work, the project construction by stages and the reasonably controlling investment.
出处 《城市道桥与防洪》 2007年第12期87-90,共4页 Urban Roads Bridges & Flood Control
关键词 竖向规划 滨海工业区 用地高程控制 长三角 防洪排涝 vertical planning, seashore industrial area, land elevation control, Changjiang Delta, flood control and drainage
  • 相关文献

参考文献6

二级参考文献7

  • 1戴慎志 陈践.城市给水排水工程规划[M].合肥:安徽科技出版,2001..
  • 2丁炳坤.工程水文学[J].北京:中国水利水电出版社,2000..
  • 3姚雨霖 任周宇 陈忠正.城市给排水[M].北京:中国建筑工业出版社,1986..
  • 4CJJ83-99.城市用地竖向规划规范()[S].[S].,1999..
  • 5福州市规划设计研究院.福州市中心城竖向规划[Z].,2000,6..
  • 6福建省水利规划院.福州市城区排涝内河整治规划报告[R].,1997,1..
  • 7陈卫,孙文全,孙慧.城市雨水资源利用途径及其生态保护[J].中国给水排水,2000,16(6):26-27. 被引量:72

共引文献94

同被引文献17

引证文献7

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部