多层分布式城市轨道交通项目进度控制解决方案 被引量:3

Schedule Control of the Rail Traffic Engineering Based on Multilayer Distributed Architecture
下载PDF
导出
摘要 大型城市轨道交通项目具有投资大、建设周期长、实施过程复杂、参与单位众多和涉及面广等特点,稍有不慎就可能造成工期拖延、投资失控,甚至产生质量隐患,故而依据轨道项目的多层分布特点建立了高效的工程项目管理进度控制系统.这对提升我国轨道项目的建设实施水平和提高整个项目投资效益有着重要的理论意义和应用价值. If handled not with great care, problems like prolonged project duration, runaway investment, even hidden quality problems are easy to arise in the construction of large--scale urban rail transit projects owing to their characteristics of vast cost, long construction period, complicated techniques, numerous involved participants and geographical disperse. In accordance with the multilayer distributed architecture, the establishment of highly--efficient project schedule control system is of great theoretical significance and practical value to the promotion of the level and efficiency of urban rail project construction in China.
作者 郭志涛 GUO Zhi-tao (Henan University of Technology, Zhengzhou 450052, China)
机构地区 河南工业大学
出处 《徐州工程学院学报》 2007年第8期45-48,共4页 Journal of Xuzhou Istitute of Technology
基金 河南工业大学科研基金资助项目(06XJC009)
关键词 轨道交通项目 进度控制 多层分布式 rail traffic engineering schedule control multilayer distributed architecture
  • 相关文献

同被引文献11

  • 1百度百科.3G[EB/OL].http://baike.baidu.com/view/808.htm?fr=ala0.
  • 2Adan Enshanssi.A monitoring and controlling system in managing infrastructure projects [J] .Building Research and Information, 1996,24,(3) : 21-26.
  • 3Russell Archibald D.Managing-High Technology Programs and Projects [M].Beijing: Tsinghua University Press,2004.
  • 4Irtishad Ahmad. Managing, processing and communication information [ J ]. Journal of management in engineering,2000,24 ( 3 ) : 165 - 173.
  • 5H. Ping Tserng, Will Y. Lin. Developing an electronic acquisition model for project scheduling using XML - based information standard [ J ]. Automation in Construction,2003, ( 12 ) 67 - 95.
  • 6Irtishad Ahmad.Managing, processing and communication intormation [J]. Journal of Management in Engineering, 2000,24(3):165-173.
  • 7H. Ping Tserng,Will Y. Lin. Developing an electronic ac- quisition model for project scheduling using XML-based information standard [J]. Automation in Construction,2003 (12) : 67-95.
  • 8薛金林,王炫.基于WEB施工总承包企业进度管理系统研究[J].建材世界,2010,31(3):119-122. 被引量:4
  • 9韩建军,程玉,郭志涛.大型复杂项目进度控制纲要编制--以某大型粮油建设项目为例[J].大江周刊(论坛),2011(9):38-39. 被引量:3
  • 10王广斌.大型建设项目总进度纲要的编制与跟踪管理[J].同济大学学报(自然科学版),2003,31(11):1359-1363. 被引量:12

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部