小湾高拱坝上游坝踵人工短缝设置效果的深入分析 被引量:4

In-depth study on effect of the induced slit at the heel of Xiaowan high arch dam
下载PDF
导出
摘要 在已有研究成果的基础上,对小湾高拱坝坝踵附近人工短缝的设置效果进行全面、深入分析。采用无厚度的接触单元模拟人工短缝的工作性态,坝体混凝土本构模型采用单轴等效拉伸软化模型,分别采用整体模型和子模型对不同人工短缝设置高程、不同的缝内水压力进行了比较分析。从运行期的整体仿真计算结果来看,小湾拱坝设上游人工短缝后,坝踵应力可以得到较大的改善,且对坝体的整体性影响较小。为了更加合理地评价高拱坝人工短缝设置的效果,建议同时考虑施工期和运行期的荷载进行综合分析计算,为小湾拱坝人工短缝的设计提供科学依据。 Effect of the induced slit at the heel of Xiaowan high arch dam is discussed in this paper based on recent study results. A no-thickness contact element is presented to simulate the work state of structure slit, uniaxial equivalent tension softening model is adopted as the constitutive model of dam concrete. The whole model and sub- model are adopted to perform FEM analysis for different structure slit by setting altitude and different water pressure in slit. The computation results during operation period show that the tensile stress on dam heel is released. Random cracks may be avoided. Structure slit has little influence on the wholeness of dam.
出处 《水力发电学报》 EI CSCD 北大核心 2007年第6期17-23,40,共8页 Journal of Hydroelectric Engineering
关键词 水工结构 人工短缝 有限元 小湾拱坝 子模型 hydrostructure structure slit FEM Xiaowan arch dam sub-model
  • 相关文献

参考文献13

二级参考文献18

  • 1孙乃波,陈胜宏.生死单元在拱坝施工仿真分析中的应用[J].水电能源科学,2004,22(3):65-67. 被引量:14
  • 2Feng Linming,Pekau Q A,Zhang Chunhan.Cracking analysis of arch dams by 3D boundary element method[J].J Struct.Eng,1996,122(6):691-699.
  • 3朱伯芳,响水拱坝裂缝成因及其处理咨询报告,1987年
  • 4朱伯芳,水土混凝土结构的温度应力与温度控制,1976年
  • 5中华人民共和国水利部.混凝土拱坝设计规范[S].北京:中国水利水电出版社,2003..
  • 6Feng L M,J Struct Eng,1996年
  • 7潘家铮,第18届国际大坝会议技术报告,1995年
  • 8黎展眉,混凝土坝技术,1994年,1期
  • 9赫尔措格 M,高拱坝技术译文集,1992年
  • 10Zhang C H,Commun Appl Numer Methods,1989年,6期

共引文献87

同被引文献79

引证文献4

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部