介绍了大峪口热电厂锅炉房(包括给煤系统、送引风系统、灰渣除尘系统、给水系统)的配置设计,循环流化床锅炉本体局部结构及材料的修改,锅炉调试(包括烘煮炉、蒸汽管道吹扫、锅炉试运行)过程中存在的问题及解决办法以及在循环流化床锅炉房设计中采用DCS控制的情况。
Description of following, layout of boiler room at Dayukou heat and power plant (including coal-feeding system,air delivery system,ash and dust removal and collection system, water - feeding system ) , boiler body's detailed structure and related material replacement , trouble shooting in the test run, (including curing of furnace, blow down of steam piping,start up and test run )and its DCS control system.
出处
《化肥设计》
CAS
1997年第1期53-56,共4页
Chemical Fertilizer Design
关键词
流化床锅炉
锅炉房
DCS控制
化肥厂
Recycling fluidized bed boildr, Design, DCS control,Operation