6Stephan Spiess, Markus Vincze, Minu Ayromlou. On the Calibration of a 6D Laser Tracking System for Dynamic Robot Measurements [J]. IEEE Trans. Instruct Measurement, 1998, 47 (1).
1Bachmann J, Linares J M, Sprauel J M, Bourdet P. Aide in decision - making: contribution to uncertainties in three - dimensional measurement[J]. Precision Engineering, 2004, 28(1): 78~88.
2Zhongcheng Yan, Chia- Hsiang Menq. Uncertainty analysis and variation reduction of three dimensional coordinate metrology[J]. International Journal of Machine Tools & Manufacture, 1999, 39: 1219~1238.
3Hansen H N, De Chiffre L. An industrial comparison of coordinate measuring machines in Scandinavia with focus on uncertainty statements [ J ]. Precision Engineering, 1999, 23(2): 185 ~ 195.
4ISO.Guidetothe Expression of Uncertaintyin Measurement[S].1993.
5施昌彦.现代计量学概论[M].北京:中国计量出版社,1994,124.
6Balsamo A,Ciommo M D,Mugno R,et al.Evaluation of CMM uncertainty through Monte-Carlo simulations[J].Annals of the CIRP,1999,48(1):425 ~ 428.
7Phillips S D.Traceability,Calibration,and Measurement Uncertainty Issues Regarding Coordinate Measuring Machines and Other Complex Instruments[A].2000 International Dimensional Workshop[C],Knoxville,Tennessee,2000.
8Wilhelm R G,Hocken R,Schwenke H.Task Specific Uncertainty in Coordinate Measurement[J].Annals of the CIRP,2001,50(2):553 ~ 563.
9Forbes A B,Harris P M.Simulated Instruments and Uncertainty Estimation[R].NPL Report,2000.
10Savio E,Hansen H N,De Chiffre L.Approaches to the calibration of free-form artifacts on coordinate measuring machines[J].Annals of the CIRP,2002,51 (1):433 ~436.