湛江奥里油发电厂2×600MW机组的凝结水精处理系统设计 被引量:1

Design of Condensate Polisher for Zhanjiang Ao Li You 2×600 MW Power Plant
下载PDF
导出
摘要 针对湛江奥里油发电厂的工程特点,对凝结水精处理系统工艺采用了前置过滤除铁+混床的处理方式,确保电厂启动和正常运行时凝结水的水质达标。离子交换树脂再生采用了英国KENNICOTT公司先进的"锥体分离"体外再生方式,在保证机组运行安全的同时,确保了树脂分离的效率。该工程的精处理设备布置也具有很强的特点,有一定借鉴价值。 In accordance with the characteristics of Zhanjiang Ao Li You power plant, condensate polishing plant was designed as Ultipleat Highflow Filter + Mix Bed to insure the condensate qualified during start-up and normal operation. Conesep R was adopted for resin regeneration. This advanced regenerating method insured boiler and turbine security as well as the resin separating efficiency. Layout of condensate polishing equipment was particular designed which could be used for reference of similar plants.
作者 左萌
出处 《广东化工》 CAS 2007年第12期100-102,111,共4页 Guangdong Chemical Industry
关键词 凝结水精处理 前置过滤器 锥体分离 布置 condensate polishing ultipleat highflow filter conesep R layout
  • 相关文献

参考文献3

  • 1DL/T5068.2006.火力发电厂化学设计技术规程[S].27.
  • 2李培元.火力发电厂水处理及水质控制[M].北京:中国电力出版社,1999..
  • 3UHF在凝结水过滤中的应用介绍[R].美国颇尔公司.13-15.

共引文献18

同被引文献2

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部