摘要 传统的中深孔炮孔现场定位布置方法,是由爆破工程师采用目测与简单的量具对爆破区域地形进行粗略估量,得出相应的爆破参数,然后根据现场情况进行孔网设计和标定。由于参数采集过程的粗略,很难精确地采集到爆破台阶高度、底盘抵抗线和前排孔的实际抵抗线等一些重要的参数,由此可能产生爆破弱面和抵抗线过大等问题,为爆破安全、质量埋下隐患。哈尔乌素项目部采用现代电子测绘技术与爆破技术相结合,提出一种中深孔爆破炮孔精确定位的新方法,很好地解决了这一问题。 The traditional method of hole-location in medium and deep hole blasting were according to engineer's rough estimation for blasting region landform by eyenaked or with some simple measures, by tbis mean the parameters were made out and then adjusted in practice. It is difficult to precisely collect some important parameters such as bench height, bottom burden and actual burden of frontal line by rough estimation,so weak surface and larger burden would be caused and potential dangers would exist. The problem was well solved in haerwusu(哈尔乌素) project department by proposing a new method which combines the modem electronic surveying with blasting.,
出处 《爆破》 CSCD 2007年第4期32-34,40,共4页 Blasting
关键词 中深孔爆破 底盘抵抗线 电子测绘 爆破设计 medium and deep hole blasting bottom burden electronic surveying blasting design
  • 相关文献

参考文献5

二级参考文献25

  • 1管志强,欧日旭.台阶深孔微差爆破在港口工程中的应用[J].化工矿山技术,1994,23(3):1-5. 被引量:2
  • 2费鸿禄 段宝福 张立国.某石灰石矿台阶爆破质量控制技术[A]..工程爆破文集(第七辑)[C].乌鲁木齐:新疆青少年出版社,2001.9.
  • 3Mohle H.Improving the trough openings process at Premier Mine utilizing electronic delay detonators[A].Symposium Series S21(The South African Institute of Mining and Metallurgy):6th Int.Sym.For Rock Fragmentation By Blasting[C]. 1999:31-40.
  • 4Preece D S, Chung S H.Development and application of a 3-D rock blast computer modeling capability using discrete elements-DMCBLAST-3D[A].Proc.of 27th Annual Conference on Explosive and Blasting Technique[C].2001(I).Orlando,Florida USA.11-18.
  • 5Chadwick J.Positioning and communication[J].Mining Magazine.1999,180(3):150-157.
  • 6Olsson M,Bergqvist I.Crack lengths from explosives in multiple hole blasting[A].Proc.5th Int.Symp.on Rock Fragmentation by Blasting[C].Rotterdam,Balkema.1996:191.
  • 7Jose A.Sanchidrian,et al.On the use of rock constants in bench blast design methods[A].Proc.7th Int.Symp.on Rock Fragmentation by Blasting[C].2002:396-405.
  • 8Greene D.Computer aided earth moving systems[J].Mining Engineering.1995,51(2):49.
  • 9Harrod G R,Sahm W C.Mining information goes real-time[A].SME Annual General meeting[C].Orlando,Florida.1998:98.
  • 10Lejuge G E,et al.Blast Damage Mechanisms in Open Cut Mining.Open Pit Mining Workshop,Perth[M].1994:96-103.

共引文献64

同被引文献37

引证文献5

二级引证文献52

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部