摘要
分析了邯钢4.3m焦炉二合一地面除尘站运行中出现阻力升高过快的原因,在实际工作中摸索出降低系统阻力的对策,取得了较好效果。
The reason is analyzed for resistance to raise too fast in operation of Two - in - One dust removing system of 4.3m coking furnace of Han Steel, some measures worked out in practice, good effect got.
出处
《河北冶金》
2007年第6期38-39,共2页
Hebei Metallurgy
关键词
焦炉
除尘系统
阻力
对策
coking furnace
dust removing system
resistance
measures