拉西瓦水电站混凝土双曲高拱坝坝基开挖 被引量:4

Foundation Excavation of High Double-curvature Arch Dam of Laxiwa Hydropower Station
下载PDF
导出
摘要 拉西瓦水电站位于高地应力区,为减少坝基开挖后的卸荷回弹,结合实际地质情况,通过对坝基开挖施工工艺的研究、探索,总结出一套有针对性的施工方法及施工工艺,有效地解决了高地应力区的坝基开挖问题,避免了坝基开挖的二次处理,加快了施工进度,提高了经济效益,可供类似工程地基开挖参考。 Laxiwa Hydropower Station is situated on an area with high terrestrial stress. In order to reduce unloaded elasticity after the excavation of dam foundation, in combination with the actual geological conditions and based on the research and exploration of excavation of dam foundation, a set of effective construction method and construction techniques were summarized, which solves effectively dam foundation excavation in the region with high terrestrial stress, avoids secondary treatment of dam foundation excavation, accelerates the progress of construction and increases economic benefits.
出处 《水力发电》 北大核心 2007年第11期59-60,共2页 Water Power
关键词 高地应力区 坝基开挖 施工技术 拉西瓦水电站 high terrestrial stress excavation of dam foundation construction technology Laxiwa Hydropower Station
  • 相关文献

同被引文献21

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部