摘要
通过嘉陵江新政船闸闸底长廊道侧支孔出水输水系统模型试验,研究出水支孔的型式、管径与排列,消能沟设置盖板等对改善闸室水流条件的影响。
Through model test for long culvert under chamber floor with side orifice outlet conduit system of Jialing River Xinzheng Lock, this paper studies the influence of outlet orifice pattern, pipe diameter and permutation, and cover plate on dissipater etc. on the current condition of the chamber gate.
出处
《水运工程》
北大核心
2007年第12期103-107,共5页
Port & Waterway Engineering
关键词
闸底长廊道
分散输水
布置
long culvert of the chamber floor
dispersed filling and emptying system
layout