某水电站地下电站开挖施工目标成本的控制措施

Research on the Controlled Measurement of Target Cost in the Excavation Construction of a Underground Water Power Station
下载PDF
导出
摘要 工程项目的成本控制旨在把施工费用控制在成本范围之内,实施成本控制是施工企业管理的一项极为重要的内容,该文结合溪洛渡水电站地下厂房工程开挖的实际条件和开挖施工实践,对施工过程中目标成本控制措施进行探讨,分析了溪洛渡地下电站开挖成本控制过程中存在的问题,提出了相应的措施和对策,研究工作可供其它类似工程借鉴和参考。 The purpose of cost control of engineering project is to control the construction expenses within the cost range, The implement of cost control is an extremely important content in construction enterprise management, In this paper, author studied and discussed on the control measure of target cost in construction process, combining the actual condition of the underground workshop excavation engineering and the construction process of Xiludo water power station. The existent problems were analyzed in construction cost control process, and the improvement measurement and countermeasure were put forward. The results can provide uses for reference and consult in other similar engineering,
出处 《国外建材科技》 2007年第6期126-129,132,共5页 Science and Technology of Overseas Building Materials
关键词 地下电站 开挖施工 成本控制 控制措施 underground water power station excavation construction cost control controlled measurement
  • 相关文献

参考文献4

共引文献71

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部