摘要 某宾馆准备在新老楼之间修建连廊,分别在三层、六层、九层和十一层与新楼相连。由于老楼是20世纪80年代的建筑,而新楼此时已施工完主体结构的地下部分,不能再做结构形式的修改,为此针对连廊部分采取何种结构形式进行大量的试算和分析工作,最终采用利用原新楼大堂柱的钢结构形式,效果非常理想。 A connecting gallery was preparing to be constructed between a new building and an old building of a hotel. The old building was built in the 1980s. And since the new building had been completed the underground part of the substructure work,the structure style could not be modified anymore, Hence,a plenty of pilot calculation and analysis had been done by the engineers for choosing an appropriate gallery' s construction style, As a result, the design that a steel structure was supported by the columns of the new building' s lobby was adopted, The design achieved the designers' expected purpose.
出处 《钢结构》 2007年第12期52-56,共5页 Steel Construction
关键词 框架-剪力墙 钢结构 连廊 加固 frame-shear wall steel structure connecting gallery reinforcement
  • 相关文献

参考文献4

  • 1TJ11-78建筑抗震设计规范
  • 2GB50011-2001.建筑抗震设计规范.[S].,..
  • 3GB50007—2002.建筑地基基础设计规范.[S].,..
  • 4汪一骏.钢结构设计手册.第三版.北京:中国建筑工业出版社,2005

共引文献290

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部