摘要
通过现场参与的两个工程实例,分别介绍了测斜管在单独钻孔和钻孔灌注桩及人工挖孔桩中的埋设工艺,及时纠正了由于测斜管的埋置不当所引起的误差,希望能对以后的工程起到借鉴作用。
Through two field-participated practical engineering, this paper separately introduces the embedding technologies of test tube in single drilling, in bored cast-in-situ pile and in artificial digging pile, in order to correct the error caused by improper embedment of test tube and offer a reference for similar engineering in the future.
出处
《山西建筑》
2007年第36期95-96,共2页
Shanxi Architecture
关键词
测斜管
临空面
埋设
支护方式
test tube, free face, embedment, support method