葛洲坝电站170MW机组推力轴承改造 被引量:2

Improvement of Thrust Bearing of the 170 MW Unit in Gezhouba Hydropower Station
下载PDF
导出
摘要 针对葛洲坝电站#1、#2水轮发电机组推力轴承长期运行中存在的安全运行隐患,为提高机组安全可靠稳定运行对#1机组的平衡块式推力轴承进行了改造,采用弹性油箱托盘支柱式推力轴承。运行结果,推力轴承瓦温、油温稳定,实践表明170 MW机组推力轴承改造是成功的、可行的。 Aiming at the safety hidden trouble of thrust bearing for Gezhouba hydro plant ^# l and ^#2 unit in long period operation, it is replaced by the elastic oil sump shoring thrust bearing in order to improve unit's safety and reliability of operation. The operation results show that temperatures of thrust bearing pads and oil are stable. So it proved that the improvement of 170MW unit's thrust bearing is successful and feasible
出处 《水电能源科学》 2007年第6期113-115,共3页 Water Resources and Power
关键词 水轮发电机 推力轴承 平衡块 弹性油箱 改造 hydraulic generator thrust bearing balance sector elastic oil sump improvement
  • 相关文献

参考文献5

二级参考文献3

共引文献27

同被引文献4

  • 1中国葛洲坝集团公司,中国水利水电建设集团公司,中国长江三峡工程开发总公司,等.水轮发电机组安装技术规范(GB/T8564-2003)[s].北京:中国标准出版社,2004.
  • 2哈尔滨大电机研究所,龙羊峡水电厂,东方电机股份有限公司,等.水轮发电机推力轴承弹性金属塑料瓦技术条件(JB/T10180-2000)[s].北京:中国水利水电出版社,2000.
  • 3刘平安,武中德.水轮发电机弹性金属塑料瓦推力轴承瓦面形状[J].大电机技术,2008(3):8-10. 被引量:14
  • 4武中德,张宏,梁广泰,吴军令,张仁江.三峡水轮发电机推力轴承[J].中国三峡建设,2003,10(9):7-8. 被引量:15

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部