武汉天兴洲公铁两用长江大桥主桥为双塔三索面斜拉桥,主梁为板桁结合钢桁梁,3片主桁,采用整体节段架设施工。对钢桁梁整体节段架设的可行性进行分析。
The main bridge of Wuhan Tianxingzhou Changjiang River Rail-cum-Road Bridge is a cable-stayed bridge with double pylons and triple cable planes and the main girder of the bridge is a slab and truss composite girder composed of three trusses that are to be erected by the integral truss girder block method. In this paper, the feasibility of erection of the steel truss girder by the method is analyzed.