摘要
麻村砂石加工系统废水处理采用新工艺、新设备,使生产的废水达到"零排放"标准,解决了砂石加工生产废水对红水河的污染问题,实现了"环境保护、废水回收利用、细砂回收利用"的目的。可为今后水电工程人工砂石料加工系统的废水处理提供一定的经验和借鉴。
Thanks to the introduction of new techniques and equipment in Macun aggregate production system for waste water disposal, the "zero discharge" standard of waste water was met, the problem of possible pollution to the Hongshui River by waste water brought about by aggregate production was solved, and the objective of "to protect the environment and to recycle waste water and fine sand" was achieved. Such successful engineering practice may be drawn by future hydropower project construction for waste water disposal of artifidal aggregate production system.
出处
《红水河》
2007年第4期17-21,共5页
Hongshui River
关键词
废水处理
工艺流程
人工砂石加工系统
龙滩水电站
waste water disposal
technical process
artificial aggregate production system
Longtan Hydropower Station