摘要
提出了一种确定成桥索力的综合方法,利用APDL二次开发技术在ANSYS中实现了综合法确定斜拉桥成桥索力,并将实例计算结果和设计值进行对比,两者差别很小.
A comprehensive method to determine cable forces was put forward. The cable forces in completion state was determined with the method using the APDL in ANSYS. There was little difference between the forces and designed results.
出处
《重庆交通大学学报(自然科学版)》
CAS
2007年第5期17-20,共4页
Journal of Chongqing Jiaotong University(Natural Science)
关键词
斜拉桥
成桥索力
ANSYS
APDL
cable-stayed bridge
cable forces in completion state
ANSYS
APDL