深圳地铁一期工程包括两座110kV主变电站,两站设备配置类似。简要介绍了主变电站自动化系统的二次设备配置情况、监控系统的硬件组成及监控软件的特点。
In the first phase of Shenzhen metro construction, there are two 110 kV main substations with the same equipment configuration. This paper briefly introduces the secondary equipment configuration of the main substation, the structure of the monitoring and control system's hardware, as well as the characteristics of the monitoring and control system' s software.
出处
《城市轨道交通研究》
2007年第12期60-62,共3页
Urban Mass Transit
关键词
主变电站
深圳地铁一期
自动化系统
保护装置
监控系统
main substation, the first phase of Shenzhen metro, automation system, protective equipment, monitoring and control system