Vacuum System in CSRm Commissioning
Vacuum System in CSRm Commissioning
-
1Zhang Junhui Zhao Yugang Hu Zhenjun Hou Shengjun.Kicker Vacuum System on CSRm[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2006(1):143-143.
-
2CAO Zeng CUI Chenghe FU Weidong LIU Dequan CAI Xiao GAO Xiaoyan.Vacuum System for HL-2A Tokamak[J].Southwestern Institute of Physics Annual Report,2004(1):51-54.
-
3Yang Xiaotian Zhang Xiping Yang Weishun Guo Dizhou Guo Zonghui.Vacuum System Design for Beam Line of Deeper Layer Cancer Therapy Device with Heavy Ions[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2006(1):142-142.
-
4Yang Xiaotian, Zhang Junhui, Meng Jun, Zhang Xiping, Hou Shengjun Hu Zhenjun, Zhang Xinjun, Wu Huimin and Hao Bingan.Progress of HIRFL-CSR Vacuum System[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2004(1):145-146.
-
5Installation and Adjustment for Vacuum System of New ECR Source Beam Line[J].IMP & HIRFL Annual Report,1997(0):99-100.
-
6New Vacuum System of SFC[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,1999(1):72-73.
-
7ZHANG Su-ping, PAN Gao-feng, XING Jian-sheng, ZHANG Tian-jue, LI Zhen-guo (Division of the BRIF Project).Insulation Consideration of the Cryo-vacuum System for CYCIAE-100[J].Annual Report of China Institute of Atomic Energy,2011(1):48-49.
-
8Yang Xiaotian,Zhang Junhui, Meng Jun, Zhang Xiping, Hou Shengjun, Hu Zhenjun Guo Dizhou, Zhang Xinjun, Wu Huimin and Hao Bingan.Progress of HIRFL-CSR Vacuum System[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2005(1):154-155.
-
9Vacuum Group.Progress of CSRm Vacuum System in 2004[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2004(1):147-147.
-
10Yang Xiaotian Zhang Junhui You Zhiming Meng Jun Jia Yusheng Niu Zhiwei Nie Zengsen Lou Meiling Yang Weishun Ma Xiangli Hao Chaoying Zhao Yugang Hu Zhenj un Hou Shengjun Guo Dizhou Luo Cheng.Vacuum System of HIRFL[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2009(1):235-236.