Annual Operation Status of 320 kV HV Platform
Annual Operation Status of 320 kV HV Platform
-
1Yuan Youjin Xia Jiawen Yang Jiancheng Zhao Hongwei Yang Weiqing Yang Yiping HIRFL Operation Group.Accelerator and the Others——Operation Status of HIRFL in 2011[J].IMP & HIRFL Annual Report,2011(1):213-213. 被引量:1
-
2Sun Liangting Li Jinyu Ma Baohua Wang Hui Wang Pingzhi Zhang Xuezhen Feng Yucheng Zhang Zimin Li Xixia Shang Yong Liu Huiping Zhao Hongwei Ma Xinwen Song Mingtao Zhan Wenlong.Recent Progress of LAPECR2[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2006(1):148-148.
-
3Sun Liangting Zhao Hongwei Zhang Xuezhen Guo Xiaohong Feng Yucheng Li Jinyu Cao Yun Lu Wang Wang Hui Ma Baohua Li Xixia Zhao Huanyu Shang Yong Jin Tao Yuan Pin Song Mingtao Zhan Wenlong Wei Baowen.Annual Operation Status of SECRAL[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2007(1):180-181.
-
4Lu Wang Sun Liangting Feng Yucheng Guo Xiaohong Zhang Xuezheng Li Jingyu Cao Yun Wang Hui Ma Baohua Shang Yong Sha Shan Ma Hongyi Li Xixia Lin Shuhao Zhang Wenhui Jin Tao Zhao Huanyu Zhao Hongwei.Annual Operation Status of SECRAL in 2009[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2009(1):269-270. 被引量:1
-
5Operation Status of 200kV Heavy Ion Accelerator[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2000(1):163-163.
-
6Feng Yucheng, Ma Baohua, Li Jinyu, Wang Hui, He Wei, Sun Liangting, Cao Yun, Li Xixia Guo Xiaohong, Zhang Xuezhen, Zhang Zimin and Zhao Hongwei.Annual Operation Status of LECR2 Source[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2004(1):165-165.
-
7ZHU Guo-sheng.MNSR Annual Operation Report[J].Annual Report of China Institute of Atomic Energy,2006(1):205-205.
-
8PLASMA SCIENCE & TECHNOLOGY ANNUAL AUTHOR INDEX TO VOLUME 7 (2005)[J].Plasma Science and Technology,2005,7(6).
-
9Sun Liangting Lu Wang Feng Yucheng Guo Xiaohong Zhang Xuezhen Li Jinyu Cao Yun Wang Hui Ma Baohua Shang Yong Sha Shan Ma Hongyi Li Xixia Jin Tao Zhao Hongwei.Annual Operation Status of SECRAL[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2008(1):160-161.
-
10Zhao Hongwei Xia Jiawen Yuan Youjun Yang Jiancheng Yang Yipin HIRFL Oopertation Group.Accelerator and the Others—Operation Status of HIRFL in 2009[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2009(1):231-231.