期刊文献+

利用CSIMAN仿真系统的NQ(Ⅰ)和NR(Ⅰ)调整MR(Ⅰ)实现机床群的合理配置

Regulate MR(Ⅰ) to Achieve Rational Disposition of Different Machine Tool Group Using NQ(Ⅰ) and NR(Ⅰ) in CSIMAN Simulation System
下载PDF
导出
摘要 本文详细地叙述了利用CSIMAN仿真系统的驻留在队列Ⅰ中的实体数NQⅠ和资源Ⅰ处于忙状态的单元数NR(Ⅰ)来调整资源Ⅰ的单元数MR(Ⅰ),以实现机床群中各种机床台数的合理配置的方法。根据资源利用率和实体排队长度,选择加工车间机床群中的关键设备并确定机床群中各种机床台数的最佳配置方案。 This paper describes in detail the methods for regulating the number MR(Ⅰ) of units of the resource Ⅰ to achieve rational disposition of different machine tool's number in the interior of a machine tool group by use of the number NQ(Ⅰ) of entities residing in queue Ⅰ and the number NR(Ⅰ) of busy units of the resouzce Ⅰ in CSIMAN simulation system.The methods select the cirtical installations from a machine tool group of machining workshop and determine an optimum plan to dispose number of different machine tools by the light of the capacity utilization of the resource and the length for the queued entities.
作者 王庆 史国栋
出处 《系统工程与电子技术》 CSCD 1997年第9期65-70,共6页 Systems Engineering and Electronics
关键词 系统模拟 机床 最优方案 仿真系统 CSIMAN System simulation Machine tool group Dispose.
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部