期刊文献+

钢吊箱下放方案的选定

Plan Selection of Steel Overhead Bin Lowering
下载PDF
导出
摘要 襄渝铁路二线流水河右线大桥位于陕西省安康市火石岩水库内,主墩基础入水深度达60 m,采用直径为2.0 m的钻孔灌注桩基础,承台为深水高桩承台,采用单壁钢吊箱围堰施工。结合工程建设实例对单壁钢吊箱的下放方案的选定进行了探讨。 Yijia River Right-strung Large Bridge and Liushui River Right-strung Large Bridge of Xiangyu Ⅱ strung railway are located in the reservoir of Ankang City. The water entry depth of its main pier foundations is 60 m, which adopt the boring cast-in-place foundation with a diameter of 2.0 m. The pile caps are elevated in deep water and adopt the single-wall steel overhead bin-cofferdam construction. In light of the construction practice, this paper discusses the plan selection of single-wall steel overhead bin' s lowering.
作者 张健
出处 《铁道建筑技术》 2007年第6期49-51,共3页 Railway Construction Technology
关键词 钢吊箱 下放方案 选定 steel overhead bin lowering plan selection
  • 相关文献

参考文献2

  • 1TB 10203-2002.铁路桥涵施工技术规范.
  • 2建设结构静力计算手册约写组.建筑结构力学计算手册.北京:中国建筑工业出版社,1975.

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部