封底混凝土的设计与施工 被引量:6

The Design and Construction of Bottom Sealing Concrete
下载PDF
导出
摘要 襄渝Ⅱ线铁路流水河右线大桥4号主桥墩基础承台为深水高桩大体积混凝土承台,桥址处于汉江火石岩水库内,承台施工采用单壁钢吊箱施工,封底混凝土厚度为2.0 m,总方量为744 m^3。结合工程实际介绍封底混凝土的配合比设计与施工。 Liushu River Right Strung Large Bridge of Xiangyu Ⅱ strung railway has deepwater mass-concrete elevated pile caps as the pile caps of its 4# main pier foundations. The bridge is located in a Hanjiang reservoir. The construction of pile caps adopts the single-wall steel overhead bins, with the bottom sealing concrete as thick as 2.0 m, and a total volume of 744 m^3. In light of the construction practice, this paper introduces the design and construction of bottom-sealing concrete' s mix ratio.
作者 张贵忠
出处 《铁道建筑技术》 2007年第6期54-57,共4页 Railway Construction Technology
关键词 钢吊箱 封底 混凝土 设计 施工 steel overhead bin bottom-sealing concrete design construction
  • 相关文献

参考文献2

  • 1TB 10203-2002.铁路桥涵施工技术规范.
  • 2建设结构静力计算手册约写组.建筑结构力学计算手册.北京:中国建筑工业出版社,1975.

共引文献4

同被引文献22

引证文献6

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部